← Back to main site

Site Assessment · Kilovolt

Tell us about
your property.

This takes about 5–7 minutes. The more you share, the faster we can evaluate — and skip the back-and-forth.

Step 1 of 4 — Your details 25%
Please fill in all required fields before continuing.
Your details
Property details

Open Google Maps → long-press your property → tap Share → copy link. This is the single most important field for our site review.

Ownership
Please answer all required questions before continuing.
Location & road access

Separate entry/exit significantly improves site suitability.

Space & parking

A single AC charger needs ~3ft × 5ft wall space + one parking slot.

Total size, not just the charging area.

Width of your property facing the road. Affects visibility and signage.

Wall mount requires a solid concrete or brick wall.

Traffic & commercial potential

Amenities increase dwell time — which directly increases charging revenue.

Please select a charger type to continue.
Charger type preference
Not sure which type? AC slow chargers (7.4kW) suit hotels, resorts, overnight stays — vehicles charge in 6–8 hours. DC fast chargers (25kW+) suit highways and transit stops — vehicles charge in 30–60 minutes.
Electricity — AC Charger (7.4 kW)
The 7.4kW AC charger requires: Single or 3-phase · 2-pole 40A MCB · 3-core 10 sqmm cable · 7.4 kW free load. Kilovolt covers cabling up to 25 metres. Beyond 25m, cable cost is shared.

7.4 kW free load required for one charger. Check your electricity bill or meter.

15 metres ⚠ Beyond 25m — cable cost beyond this point is shared
Electricity — DC Fast Charger (25 kW+)
DC fast chargers require 3-phase electricity with at least 30–50 kW sanctioned load and transformer access nearby. We assess this fully during the site visit.
⚠ DC fast chargers require 3-phase. Single phase is not sufficient — we can advise on upgrading during site assessment.

Minimum 30 kW free load required for a 25 kW DC charger.

20 metres ⚠ Longer cable runs increase cost — we'll discuss during site visit

DC charger units require a concrete pad foundation. Civil work can be arranged if needed.

Partnership model
Timeline & status
Additional information

The more you share, the better prepared we'll be for your site visit.

Site photos & video
📸 Photos and video speed up our evaluation significantly. After submitting, please send them on WhatsApp — instructions will appear on the next screen.

We review all submissions within one business day and contact you by phone first.

Assessment received.

We've got your full site details. Our team will review and get back to you within one business day — by phone first. Keep your mobile handy.

📸 What to send — daytime photos only

Please send clear daytime photos and a short video of:
1. The property from the road (frontage & visibility)
2. The parking area / space for the charger
3. Entry and exit points
4. Your electricity meter room or distribution board
5. A short walk-through video of entry → exit → proposed charger spot
⚠ Night photos or videos cannot be used for site assessment. Please send only clear daytime shots.

Common questions

Before you fill the form.

Your name, mobile number, email, a Google Maps link to your property (the most important field — open Maps, long-press your location, tap Share), property type, state, approximate space, and electricity connection type. The rest are optional but help us evaluate faster.
No. Kilovolt's standard model is zero investment for the property owner. We cover equipment, installation, grid connection, and maintenance. You provide the space and earn a revenue share from every charging session. Co-investment options are available for a higher revenue share.
For an AC slow charger (7.4kW), single phase or 3-phase with at least 7.4 kW free load is required. A 2-pole 40A MCB and 3-core 10 sqmm cable are needed — Kilovolt covers cabling up to 25 metres from your meter room. For a DC fast charger (25kW+), 3-phase with at least 30 kW free load is required.
An AC slow charger needs approximately 3ft × 5ft of wall or pedestal space plus one dedicated car parking slot. A DC fast charger needs more — typically 200 sq.ft or more for the unit plus vehicle movement. Kilovolt confirms exact requirements during the site visit.
Yes. Hotels, resorts, commercial complexes, and parking lots that are not highway-facing can qualify for AC slow charging — ideal for overnight or extended-stay guests. Highway-adjacent properties with good visibility are prioritised for DC fast chargers. Fill the form and we'll assess suitability.
Send clear daytime photos of: (1) property frontage from the road, (2) parking area or space for the charger, (3) entry and exit points, (4) electricity meter room or distribution board, and (5) a short walk-through video of entry, exit, and the proposed charger location. Night photos cannot be used — please send only well-lit daytime shots.
We review submissions within one business day and call you first. If the site is shortlisted, a site visit is scheduled. After approval and agreement signing, installation typically takes 4–8 weeks depending on civil work, electricity, and equipment.
Kilovolt is fully responsible for all maintenance, remote monitoring, software updates, and technical support. You have zero maintenance obligations. If a charger has an issue, our team resolves it.